Outdoor Kitchen Gas Line Installation
In Severna Park, MD

Maryland requires a separate gas fitter certification beyond a standard plumbing license for this work. We hold both. Your outdoor gas lines will be sized for your full BTU load, pressure-tested, and fully permitted.

Last updated: September 2026
Licensed Maryland Gas Fitter Anne Arundel Permit Included Pressure-Tested For Safety Open 7 Days

Fitchet Plumbing installs outdoor kitchen gas lines throughout Severna Park, MD — including Round Bay, Linstead on the Severn, Ben Oaks, Chartwell waterfront sections, and properties along Governor Ritchie Highway and the Magothy River corridor. Gas lines are accurately sized for your full appliance BTU load, pressure-tested before any appliance connection, and permitted through Anne Arundel County. MD License #70218.

Why Outdoor Gas Line Work Requires
A Licensed Gas Fitter

This is not a job that any licensed plumber can legally perform. Maryland requires a separate gas fitter license — issued by the Maryland Plumbing Board after specific training and examination focused on gas systems — beyond a standard plumbing license. A contractor who does not hold this certification is not legally permitted to install or repair gas lines in Maryland.

An incorrectly installed gas connection can produce an undetected leak that accumulates to explosive concentrations. The certification ensures your contractor understands gas system design, BTU sizing, pressure testing, and code compliance. Fitchet Plumbing holds Maryland Board of Plumbing License #70218 and a separate Maryland gas fitter certification.

Verify Our Credentials

Our dual Maryland certifications (Plumber & Gas Fitter) are fully verifiable at dllr.state.md.us. Don’t compromise on gas safety.

Call For A Quote

What Outdoor Kitchen Gas Line
Installation Covers

1

Site Assessment & BTU Load

Before any pipe is run, we calculate the total BTU demand of all planned appliances. Undersizing the supply line produces insufficient pressure when multiple appliances run simultaneously.

2

Route Planning

For Severna Park’s waterfront properties, we determine whether a buried underground run (requiring trenching and conduit) or a properly supported above-ground UV-resistant run is most practical.

3

Line Installation

We use black iron pipe for buried/permanent sections and approved flexible connectors for final appliances. We also install an accessible, code-required ball-valve shutoff at the outdoor connection point.

4

Pressure Testing

The completed gas line is pressurized and monitored for a sustained period before any appliance is connected. Zero pressure loss confirms there are absolutely no leaks.

5

Permit & Inspection

We file the Anne Arundel County permit before work begins and coordinate the inspection after installation. You don’t have to handle any county paperwork.

6

Appliance Connections

After the permit inspection passes, connections are made to each appliance. Every appliance is tested for proper ignition and flame consistency before we conclude the job.

Sizing For Your Specific Appliances

Every appliance connected to a permanent line adds to the BTU load. Common configurations we pipe for Severna Park waterfront properties include:

  • Built-in gas grill: 35,000–60,000 BTU/hr.
  • Side burners (2-burner): 12,000–30,000 BTU/hr total.
  • Gas patio heater: 40,000–50,000 BTU/hr.
  • Outdoor pizza oven: 60,000–100,000 BTU/hr (requires careful line sizing).
  • Outdoor gas fireplace or fire pit: 50,000–100,000 BTU/hr.
  • Standby generator: 150,000–200,000 BTU/hr (typically run as a separate dedicated line).

Timing Your Project

Peak demand runs April through September. For a Memorial Day deadline, start planning in March.

Typical timeline: Site visit (same week) → Permit (5-10 days) → Install (1 day) → Inspection (1 week) → Final Connection. Total: 2–4 weeks.

Start Planning Now

Frequently Asked Questions

Yes. New gas line installations require permits in Anne Arundel County to verify proper sizing, connections, and pressure testing. Fitchet Plumbing handles all permit pulling and inspections.
It typically runs $800–$2,500. The exact flat-rate depends on line length, the number of appliance connections, and whether trenching is required. Permits are included.
It depends on your current pipe diameter and the total BTU demand of your planned appliances. We calculate this during your initial site assessment.
A permanent line means you never run out of fuel mid-cook, eliminating tank storage and delivery logistics. It has a higher initial cost but is significantly cheaper and more convenient over time for high-use kitchens.
The physical installation takes one day. However, the full project timeline from scheduling to permitted completion runs 2–4 weeks due to Anne Arundel County permit processing times.